What does a 100 MW AI data centre require?
Follow the electricity from the grid to the computers, and the heat back out.
Lyon Industries studies technical problems and develops evidence to support decisions about what to build, test, and apply.

Operating model
A technical idea moves through evidence, integration, and operating constraints before it can be tested in a market.
Map the evidence, mechanism, unknowns, and first failure before choosing what to build.
Combine engineering and software to build and test an idea.
Consider safety, supply, deployment, cost, and lifecycle beyond the prototype.
Explore a focused commercial application when the technology is ready for a market test.
Evidence guides each step: test the idea, account for the cost and conditions of use, and pursue a market when the technology is ready.

Selected work
We build and test tools to answer practical engineering questions.
Explore how people, organisations and ideas connect across a collection of documents. GraphRAG Workbench lets you build and inspect the graph behind the answers.
Explore the researchElectrical engineering
A circuit board passed automated checks but failed review of its physical layout.
Read the researchMechanical engineering
One test used a language model and CAD tools to create four checked bracket models.
Read the researchAI and manufacturing
A 59-product test for World Patches, from the image brief to the supplier file.
Read the researchRobotics
A browser bench tests hand commands and stop checks against a simulated robot.
Read the researchPublications
Detailed records of the questions, methods and results behind our engineering work.
Working papers · PDF

Working paper 01 · 13 July 2026
What it takes to check an AI-assisted PCB design before fabrication.
Read the paper (opens in a new tab)
Working paper 02 · 15 July 2026
How typed operations and validation produce exact CAD geometry.
Read the paper (opens in a new tab)
Working paper 03 · 16 July 2026
A four-bracket CAD case, from the design brief to checked geometry.
Read the paper (opens in a new tab)Analysis
Clear explanations of the technology, costs and choices behind the headlines.
AI infrastructure
Follow the electricity from the grid to the computers, and the heat back out.
Lunar resources
Compare the soil, equipment and production needed to make oxygen on the Moon.
Contact
Tell us what you're working on and what you need to decide.
christopher@lyon-industries.no